Dario Codipietro

Case studies · 2022 to 2025 · Lead Product Designer

Samsung Food

Samsung Food is a recipe and meal planning app with a large daily audience, where I was Lead Product Designer. These seven case studies cover meal planning, recipes and health.

Role
Lead Product Designer
Product
Recipe and meal planning app
Years
Apr 2022 to Mar 2025
Five Samsung Food screens: a Tailored Plan week, the to-do list planner, a replacement list for ground beef, the Personalize recipe sheet and the weekly progress chart on the profile.
The v2 handover flow across eight screens: ingredients at hand, a generating state, add missing ingredients to shopping, the generated week, the review missing ingredients banner, the shopping list picker, and the confirmation toast.
Tailored Plan. The generated week in the handover flow, with the missing ingredients added to the shopping list.

01Four case studies

Meal planning

The Tailored Plan and the planner around it.

  • 2025 Tailored Plan Moving the planner from an empty state to a prepopulated weekly plan. 9 min read
  • 2024 Swap Meals in the Tailored Plan Scope negotiated with engineering down to a randomised swap in place, free for all users. 7 min read
  • 2024 Casual Meal Planner A to-do list mode in the planner for users who plan casually. 8 min read
  • 2024 Planner Improvements Five planner briefs, including notes, personalised servings and leftovers, each taken to handover. 7 min read
The Change diet journey in Samsung Food+ across five screens: the recipe page, the Personalize recipe sheet, the diet preselected, the wait for the conversion and the converted recipe to review.
Recipe AI. Change diet in Samsung Food+, with the diet preselected and the converted recipe opened for review.

02Two case studies

Recipes

Adapting recipes to the way a user eats, first by ingredient and then with AI.

  • 2023 Ingredient Substitutions Ingredient swaps on any recipe, for Basic, Beta and Premium users. 4 min read
  • 2023 Recipe AI Generative tweaks that convert any recipe, released in Beta and then in Samsung Food+. 4 min read
The released flow across four screens: a tailored meal plan, the daily nutrition goals in the planner, the weekly progress chart on the profile, and the goals sheet.
Health Dashboard. The released flow, with the daily goals in the planner and weekly progress on the profile.

03One case study

Health

Nutrition goals and weekly progress from the data users enter.

  • 2024 Health Dashboard The first health dashboard, descoped from an inferred score to hard metrics. 6 min read

Contact

Get in touch

Product design lead across research, design systems and handover, with coding agents in the loop. Contract, outside IR35, or a permanent lead role.

Available
Now
Location
London, remote or hybrid, UK and EU
Right to work
UK settled status, EU citizen
  • RolesLead Product Designer, Principal Product Designer, Design Engineer
  • Experience10+ years
  • ScopeResearch, design systems, prototyping, handover, QA with agents
  • LanguagesEnglish, Italian, Spanish
  • Email[email protected]
  • LinkedInlinkedin.com/in/dariocodipietro

Professional profile

Copy into your coding agent

Skills

  • Product design, end to end
  • UX and interaction design
  • Visual design and motion
  • Prototyping in Figma and code
  • Design systems at scale
  • User research and testing
  • A/B testing and analytics
  • Strategy and discovery
  • AI product design
  • Design to code, with agents
  • Accessibility, WCAG 2.2 AA
  • Leadership and mentoring

Platforms

iOS, Android, responsive web, smart TV and connected devices

Sectors

  • AI products
  • B2B SaaS
  • Consumer apps
  • Streaming, media and sport
  • Health, wellness and food
  • Legal tech
  • Telecoms and utilities

Tools

  • Figma
  • FigJam
  • Figma Make
  • Claude Design
  • Framer
  • Axure RP
  • Storybook
  • Claude Code
  • Cursor
  • Codex
  • MCP
  • GitHub
  • Linear
  • Jira
  • Confluence
  • Notion
  • Miro
  • Prolific
  • Lyssna
  • Maze
  • PostHog
  • Amplitude

Send a message

Tell me about the role and when it starts, and I will reply by email.